Zhejiang Hengcheng Chemical Equipment Maintenance Installation Co., Ltd.

The predecessor of Zhejiang Hengcheng Chemical Equipment Maintenance Installation Co., Ltd. is the direct project department of petrochemical installation under the Jiangsu Tianmu Construction Group Co., Ltd. After more than 30 years of hard work and hard work, it officially became Zhejiang Hengcheng in April 2014. Chemical Equipment Maintenance and Installation Co., Ltd., with a registered capital of 58 million yuan, and with the registered capital increased to 158 million yuan in June 2018, the company has grown to become a company with pressure pipeline level, boiler installation level, and lifting machinery level.


The company is mainly engaged in: undertake the installation, maintenance, repair, overhaul, maintenance, maintenance and technical consulting services of chemical equipment, electromechanical equipment, electrical instruments, pressure pipes, boilers and lifting appliances; the renovation of pressure pipes and boilers; General contracting for chemical engineering, mechanical and electrical installation engineering, building construction engineering, foundation and foundation engineering, municipal engineering, fire protection facilities engineering, electric power engineering, building decoration and decoration engineering, steel structure engineering, lifting and hoisting engineering, thermal insulation and anticorrosion engineering; lifting Mechanical and construction equipment leasing; industrial design of chemical equipment.


The company relies on its strong technical advantages, excellent technical literacy, honest professional ethics and diligent on-the-spot work style. It has successively undertaken the installation project of 2*3602 sintering ring cooler waste heat power generation project of Hebei Iron and Steel Group Xuanhua Iron and Steel Co., Ltd. and the PTA boiler island installation project of Jiaxing Petrochemical Co., Ltd. (including 2 sets of 150 tons of circulating fluidized bed boilers and 1 set of 175 tons of natural gas coal). Annual production of 800,000 tons of PTA sewage treatment project, Zhejiang Hengda 330,000 tons of polyester engineering, Fujian Jinlun High Fiber Co., Ltd. Phase III and Phase IV polyester, Zhejiang Hengjia 270,000 tons of polyester engineering, China Resources Packaging Materials Co., Ltd. 600,000 tons of bottle-grade polyester installation project, Zhejiang Longteng Technology Development Co., Ltd. polyester project, Tongkun Group Zhejiang Hengtong Chemical Fiber Co., Ltd. 400,000 tons of polyester engineering, Tongkun Group Hengteng Phase I annual production of 400,000 tons of polyester , Huaxiang (China) High Fiber Co., Ltd. B section installation and construction, Tongkun Group Co., Ltd. Hengbang Phase IV 400,000 tons of polyester, Zhangjiagang Xin Jinyang High-tech Materials Co., Ltd. Annual production of 200,000 tons of polyester engineering , Hengteng Phase II 600,000 tons of polyester engineering, POY, FDY, TMT spinning project total 220 lines, Jiaxing Petrochemical Co., Ltd. Phase II Thai Terminal PX pipeline (including some OSBL sporadic projects) installation total contractor Tongxiang Henglong Chemical Co., Ltd. Henglong Chemical Phase II stainless steel storage tank production and installation, Zhejiang Hengsheng Chemical Fiber Co., Ltd. Hang Seng Phase I, Phase II polyester demolition installation, Tongkun Group Co., Ltd. Hengbang CP2 filament 10 line installation, Jiaxing Petrochemical Co., Ltd. Annual production of 1.2 million tons of PTA project main equipment North and East main road repair and sporadic increase project, Tongkun Group Co., Ltd. Hengbang Phase III spinning installation project, Tongkun Group Zhejiang Hengteng Differential Fiber Co., Ltd. Installation and construction of automatic doffing and packaging integrated system, installation of CP2 polyester and acetaldehyde recovery unit of Tongkun Group Co., Ltd., and 40 million tons/year refining and chemical integration project of Zhejiang Petrochemical Co., Ltd. (Phase I) 2-2 standard section pipe gallery installation project, China Kunlun Engineering Co., Ltd. Jiaxing Petrochemical Co., Ltd. Annual production of 300,000 tons of differentiated fiber project polyester project, Zhejiang Petrochemical Co., Ltd. 4 million tons / year refining and chemical integration project (Phase I The construction project of the four-standard section of the finished oil depot area and the 200,000-ton high-function fully-differentiated chemical fiber technology project of Tongkun Group Co., Ltd. Guokun Engineering Co., Ltd. Tongkun Group Zhejiang Hengteng Differential Fiber Co., Ltd. Annual production of 600,000 tons of functional differential fiber project Polyester project Tongkun Group Co., Ltd. Hengbang Phase III natural gas furnace installation, etc. More than 200 well-known The project, and some projects won the honorary title of “China Installation Star” and “Installation Engineering Excellence Award”, which achieved good social benefits and generated certain popularity in the installation industry.



我们的服务

公司佣有健全的质量保证体系、安全生产管理体系,具有完善的管理制度、操作规程。公司秉承“团结敬业、开拓创新、追求卓越”的企业精神,工地秉承“管理创造价值,服务提升优势,品质至上,服务质优”的发展理念。公司倍加珍惜每一分信认和荣誉,不断将优质工程贡献给社会,与社会各界优势互补、同创辉煌!

版权所有:浙江恒诚化工设备检修安装有限公司 Copyrights ©2018 All Rights Reserved

TOP